A sequential heuristic programming approach for a corrugated box factory: trade-off between set-up cost and trim waste
by Pierrette Zouein, Jessica Diab
International Journal of Simulation and Process Modelling (IJSPM), Vol. 6, No. 1, 2010

Abstract: This paper considers a corrugator trim problem for a cardboard boxes manufacturing plant that produces boxes of various sizes servicing known customer demand. We present a suboptimal three-step procedure that minimises both trim waste and setup time cost where setup cost is measured as the loss of production resulting from stock rolls size changes. The procedure leads to the least-cost method of combining customer orders on the corrugator and the optimal roll width to use. The paper concludes by applying the proposed method to derive a lower cost schedule for Unipak, one of the leading manufacturer of cardboard boxes in Lebanon.

Online publication date: Sun, 11-Apr-2010

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Simulation and Process Modelling (IJSPM):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com