Performance analysis of scheduling rules in resource-constrained multiple projects
by Balasubramanian Kanagasabapathi, Chandrasekharan Rajendran, Kuppuswamy Ananthanarayanan
International Journal of Industrial and Systems Engineering (IJISE), Vol. 4, No. 5, 2009

Abstract: In the Resource-Constrained Multi-Project Scheduling (RCMPS) literature, studies on scheduling involving the minimisation of the maximum tardiness of multiple projects are rather limited. This paper, therefore, analyses the performance of the existing and newly proposed scheduling rules in the static RCMPS environment by considering performance measures involving Mean Tardiness (MT) and the Maximum Tardiness (MaxT) of projects. The present work evaluates scheduling rules that consider project due-dates, operation/activity duration times, operation/activity due-dates, project slack and activity slack, and presents the results of performance evaluation.

Online publication date: Fri, 27-Mar-2009

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com