APRAM: an advanced programmatic risk analysis method
by Robin L. Dillon, M. Elisabeth Pate-Cornell
International Journal of Technology, Policy and Management (IJTPM), Vol. 1, No. 1, 2001

Abstract: While engineering projects are expected to accomplish more with fewer resources, the dependencies among these projects have continually increased. At NASA, for example, faster-better-cheaper (FBC) projects are being grouped into programmes to enhance the benefits of synergies among smaller projects, and to attenuate, through diversification, the risks of single large missions. Under strict resource constraints, FBC project managers must balance several types of failure risks including the effect of their project's performance on future missions. Existing risk analysis models generally focus on the quantification of either technical or management risks. These tools, while beneficial, are generally used in isolation, and tightening the constraints generally encourages decisions that can increase the risks of technical failure. Since it is difficult to balance simultaneously cost, schedule and performance of a given project as well as their effects on other projects, managers who face these problems can benefit from an integrated programmatic risk analysis. In this paper, we present an advanced programmatic risk analysis model (APRAM) that is based on probability and systems analysis. It includes both managerial and technical risks, and can support decisions such as the choice of a design and of a budget reserve at the onset of a project. The model starts with the analysis of the trade-off between reserves and system development, then incorporates the effects of testing and reviews, partial mission failures, and project dependencies within programmes. The method is illustrated by the schematic example of two projects in an unmanned space programme.

Online publication date: Mon, 18-Aug-2003

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Technology, Policy and Management (IJTPM):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com