Construction safety risk assessment method of construction engineering based on improved SVM Online publication date: Fri, 20-Oct-2023
by Quan Yin; Junqing Zhou; Yi Zhou; Zhi-ping Li
International Journal of Sustainable Development (IJSD), Vol. 26, No. 3/4, 2023
Abstract: In this study, SVM was improved to complete the design of a building safety risk assessment method. This method selects the index to design the scientific evaluation system and completes the calculation of the index weight. Then, the support vector machine is improved and optimised. The judgement matrix is established according to the nine-level scale method, and it is standardised as the input of SVM, and the building safety risk assessment grade is output through the optimal hyperplane classification. The results show that the generalisation error of this method is between 0.034 and 0.053, and the evaluation time is between 1.5 h and 2.5 h, which can better evaluate the safety risk of engineering construction.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Sustainable Development (IJSD):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com