A bottleneck-based due-date assignment methodology
by Yu-Jen Chang, Ching-En Lee
International Journal of Manufacturing Technology and Management (IJMTM), Vol. 1, No. 2/3, 2000

Abstract: On-time delivery is one of the most important performance criteria in today's manufacturing systems. To enhance delivery performance, the appropriate assignment of an order's due-date is necessary. In recent years, many due-date setting methods based on regression analysis models have been proposed. Although some of them emphasise the use of shop floor information in due-date setting, the bottleneck scheduling information has not yet been taken into consideration by those methods. It is the objective of this paper to propose a new due-date assignment method based on bottleneck scheduling information. To assign an order's due-date, this proposed method first optimises the job sequence at the bottleneck using a Tabu search algorithm and then predicts the order's flow time after its completion of its bottleneck operation. Experimental results show that the proposed method can greatly enhance the delivery performance.

Online publication date: Wed, 02-Jul-2003

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Manufacturing Technology and Management (IJMTM):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com