Cost of energy infrastructure in Europe and Austria: electricity, gas, oil, and heat
by Gilbert Ahamer
International Journal of Global Environmental Issues (IJGENVI), Vol. 20, No. 2/3/4, 2021

Abstract: The present research analysis of over 250 pieces of literature identifies the cost of energy networks. a) The basic question is: what does the energy infrastructure cost now?; b) The further perspective is: how much will energy networks cost in the future when achieving the climate protection goals by an energy transition? For the target of cost finding estimates, the current Austrian projects to construct new energy lines are used because cost data can be retrieved for them. Network costs are (as a mean with a wide spread within the energy sources): electricity: 1.5 M€/km to 3 M€/km, with an average of 2.3 M€/km; gas: 0.5 M€/km to 2.5 M€/km (mainly depending on the pipe diameter), oil: 1.6 M€/km; and heat: 0.2 to 1.8 M€/km. Overall, a very rough estimate for all four energy carriers is: around 2 M€/km (i.e., ~1+1 M€/km each for line-oriented + point-oriented costs, such as transformer stations).

Online publication date: Mon, 21-Feb-2022

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Global Environmental Issues (IJGENVI):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com