Worm optimisation algorithm to minimise the makespan for the two-machine scheduling problem with a single server Online publication date: Tue, 15-Jun-2021
by Jean-Paul Arnaout
International Journal of Operational Research (IJOR), Vol. 41, No. 2, 2021
Abstract: This paper considers the problem of scheduling a given set of jobs on two identical parallel machines. Each job must be processed on one of the machines, and prior to processing, the job is set up on its machine using one server; the latter is shared between the two machines. This problem is known as the two-machine scheduling problem with a single server, and our objective is to minimise the makespan. A worm optimisation algorithm (WO) is introduced for this NP-hard problem, and its performance is compared to ant colony optimisation, simulated annealing, and genetic algorithm, as well as exact approach. The superiority of WO over the other algorithms is obtained through extensive computational results.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Operational Research (IJOR):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com