Research on estimation of equipment maintenance duration based on AHP-FIE risk analysis
by Zhengkun Dai; Lu Yao; Jiandong Qin
International Journal of Industrial and Systems Engineering (IJISE), Vol. 38, No. 2, 2021

Abstract: Equipment maintenance duration is an important indicator of equipment maintenance management, and it is a key factor to measure the success or failure of a maintenance project. In view of inaccurate estimation and frequent changes in schedule, this paper considers the characteristics of many uncertain factors and studies the duration estimation of equipment maintenance from the perspective of risk analysis. Based on the new method (AHP-FIE risk analysis) with analysing the characteristics of practical case and optimising the estimated duration value, the goal of reasonably shortening duration can be achieved. The analysis results provide theoretical and practical reference for equipment maintenance duration optimisation management.

Online publication date: Fri, 28-May-2021

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com