Two-machine chain-reentrant flow shop with the no-wait constraint
by Karim Amrouche; Mourad Boudhar; Nazim Sami
European J. of Industrial Engineering (EJIE), Vol. 14, No. 4, 2020

Abstract: This paper addresses the chain-reentrant flow shop scheduling problem with two machines and n non-preemptive jobs in the presence of the no-wait constraint; we assume that each job passes from the first machine to the second and returns back to the first machine. The objective is to minimise the makespan. The general problem is NP-hard in the strong sense. Based on a dynamic programming algorithm, we prove that the problem is polynomially solvable when the execution order of the jobs through the machines is a fixed permutation. For the resolution of the general problem, we propose a linear mathematical model, local search heuristics, a simulated annealing metaheuristic and lower bounds with numerical experiments. [Received: 8 February 2019; Revised: 19 June 2019; Revised: 26 August 2019; Revised: 8 October 2019; Revised: 9 November 2019; Accepted: 11 November 2019]

Online publication date: Mon, 20-Jul-2020

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the European J. of Industrial Engineering (EJIE):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com