Scheduling of automated guided vehicles and machines in flexible manufacturing systems: a simulation study
by Essam Kaoud; Mahmoud Heshmat; Mahmoud A. El-Sharief; Mohamed G. El-Sebaie
International Journal of Industrial and Systems Engineering (IJISE), Vol. 35, No. 3, 2020

Abstract: Flexible manufacturing systems (FMSs) have widely expanded in industry sectors all over the world. Scheduling is one of the problems that face the life cycle of FMSs. This paper introduces the simultaneous scheduling problem of automated guided vehicles (AGVs) and machines in FMSs. The study is based on discrete event simulation (DES) to solve that problem using benchmark data used by previous studies. The objective of this study is to determine the starting and completion times of each job to minimise the makespan. The results validate the robustness of the simulation model, especially for large-scale problems. Furthermore, they are compared against the other approaches and show consistency.

Online publication date: Wed, 17-Jun-2020

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com