Journal cover image

Browse issues


Vol. 30
Vol. 29
Vol. 28
Vol. 27
Vol. 26
Vol. 25
Vol. 24
Vol. 23
Vol. 22
Vol. 21
Vol. 20
Vol. 19
Vol. 18
Vol. 17
Vol. 16
Vol. 15
Vol. 14
Vol. 13
Vol. 12
Vol. 11
Vol. 10
Vol. 9
Vol. 8
Vol. 7
Vol. 6
Vol. 5
Vol. 4
Vol. 3
Vol. 2
Vol. 1

International Journal of Industrial and Systems Engineering

2011 Vol. 8 No. 3

 

PagesTitle and authors
271-297Behavioural analysis of urea decomposition system in a fertiliser plant
S.P. Sharma, Harish Garg
DOI: 10.1504/IJISE.2011.041539

298-325Optimal production run length for products sold with warranty in a deteriorating production system with a time varying defective rate under allowable shortages
Abdur Rahim, Mohammed Fareeduddin
DOI: 10.1504/IJISE.2011.041540

326-345Process costing of the microchip
Bhaskaran Gopalakrishnan, Dipesh Gajera, Deepak P. Gupta, Ragu Athinarayanan, Subodh A. Chaudhari
DOI: 10.1504/IJISE.2011.041541

346-365Supplier evaluation and selection for a manufacturing industry using analytical hierarchy process – a case study
N. Arunkumar, L. Karunamoorthy, S. Muthukumar
DOI: 10.1504/IJISE.2011.041542

366-385An integrated production–inventory model with raw material, production and final product deteriorations
Chafik Abid, Lotfi Tadj
DOI: 10.1504/IJISE.2011.041543

386-406Preventive replacement schedule: a case study at a processing industry
Rosmaini Ahmad, Shahrul Kamaruddin, Ishak Abdul Azid, Indra Putra Almanar
DOI: 10.1504/IJISE.2011.041544