Title: A modified serial scheduling scheme for resource constrained project scheduling weighted earliness tardiness problem

Authors: Srijith Rajeev; Sabu Kurian; Brijesh Paul

Addresses: Department of Mechanical Engineering, Federal Institute of Science and Technology (FISAT), Hormis Nagar, Mookkannoor PO, Angamaly, Kerala, PIN – 683577, India ' Department of Mechanical Engineering, Mar Athanasius College of Engineering (MACE), College Jn PO, Kothamangalam, Kerala, PIN – 682666, India ' Department of Mechanical Engineering, Mar Athanasius College of Engineering (MACE), College Jn PO, Kothamangalam, Kerala, PIN – 682666, India

Abstract: This paper proposes a modified serial scheduling scheme for resource constrained project scheduling weighted earliness tardiness problem (RCPSPWET). Project activities are assumed to have known unit earliness and tardiness penalty cost and constant renewable resource requirements. The objective is to schedule the activities in such a way that it minimises the total weighted earliness-tardiness penalty cost of the project, subject to the precedence constraints and the constant renewable resource availability constraints. A modified serial scheduling scheme using a sliding factor is proposed along with a heuristic method for solving the RCPSPWET.

Keywords: particle swarm optimisation; PSO; project scheduling; serial scheduling scheme; resource constrained scheduling; weighted earliness tardiness; project management; precedence constraints; renewable resources; resource availability; sliding factor.

DOI: 10.1504/IJIDS.2015.071373

International Journal of Information and Decision Sciences, 2015 Vol.7 No.3, pp.241 - 254