Exergoeconomic evaluation of a geothermal power plant
by Hadi Ganjehsarabi; Ali Gungor; Ibrahim Dincer
International Journal of Exergy (IJEX), Vol. 14, No. 3, 2014

Abstract: In this study, exergy and exergoeconomic analyses of the Dora II geothermal power plant (DGPP) with 9.5 MW net power output are carried out by using real thermodynamic and cost data. The exergetic efficiency of this plant is calculated to be 29.6%. The highest exergy destruction rate among the DGPP components occurs in the cooling towers followed by the turbines, vaporisers, preheaters and pumps. For exergoeconomic analysis, the cost balance equation for each component is written based on certain parameters and auxiliary equations to determine the cost values of exergy destruction. The costs of exergy destruction and electricity produced are determined based on the analysis and data used. The cooling tower I exhibits the greatest exergy destruction cost, followed by the turbines. The present results show that the unit cost of electricity produced and the exergy cost of geothermal fluid are 5.3 cents/kWh and 1.67 cents/kWh for DGPP, respectively.

Online publication date: Mon, 02-Mar-2015

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Exergy (IJEX):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com