A Monte Carlo simulation to estimate TAGV production time in a stochastic flexible automated manufacturing system: a case study
by Hamed Fazlollahtabar; Alireza Es'haghzadeh; Hamed Hajmohammadi; Ali Taheri-Ahangar
International Journal of Industrial and Systems Engineering (IJISE), Vol. 12, No. 3, 2012

Abstract: This paper concerns with applying tandem automated guided vehicle (TAGV) configurations as material handling devices and optimising the production time considering the effective time parameters in a flexible automated manufacturing system (FAMS) using Monte Carlo simulation. Due to different configurations of TAGVs in an FAMS, the material handling activities are performed. With respect to various stochastic time parameters and the TAGV defects during material handling processes, sample data are collected and their corresponding probability distributions are fitted. Using the probability distributions, we model the TAGV material handling problem via Monte Carlo simulation. The effectiveness of the proposed model is illustrated in a case study.

Online publication date: Sat, 20-Dec-2014

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com