Energy and exergy analysis of a gas turbine power plant in Algeria
by Fouad Khaldi; Belkacem Adouane
International Journal of Exergy (IJEX), Vol. 9, No. 4, 2011

Abstract: An exergy analysis of a twin ABB GT13E2 Gas Turbines (GTs) power plant (2 × 146.2 MW) is presented in this paper. This plant is running since 2004 at F'Krina in the northeastern part of Algeria. The analysis was performed by the flow-sheet programme, 'Cycle-Tempo'. At off-design load (83%), the plant and its apparatus conserve nearly the same design load performances. However, the performance of the plant decreases under higher air temperatures. The combustor is the first loser of exergy; this trend increases with increasing air temperature. Preheating air has considerable positive impact on the plant efficiency.

Online publication date: Thu, 01-Dec-2011

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Exergy (IJEX):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com