Shared resources in production systems: (max,+) analysis
by Olivier Boutin, Bertrand Cottenceau, Jean Jacques Loiseau, Anne L'Anton
International Journal of Mathematics in Operational Research (IJMOR), Vol. 3, No. 2, 2011

Abstract: This paper deals with formal modelling of Petri nets including shared resources. These phenomena appear widely in the production management context, for the modelling of manufacturing cells. But, they usually cannot be formally represented in dioid algebraic structures based on sets of scalars. In this paper, we design a method to describe such a phenomenon in a dioid of intervals. In fact, the resource-sharing problem is turned into a time uncertainty problem, regarding the access to the shared resource. In this new problem, time uncertainties are bounded and can be described by intervals. Both bounds of the behaviours of the studied production systems can be manipulated in the scope of the ℤmax dioid, even though the original systems are not ℤmax linear by essence.

Online publication date: Thu, 12-Feb-2015

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Mathematics in Operational Research (IJMOR):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com