Grouping decomposition under constraints for design/build life cycle in project delivery system Online publication date: Mon, 04-May-2009
by Lou Y. Liang
International Journal of Technology Management (IJTM), Vol. 48, No. 2, 2009
Abstract: The design/build project delivery system has been adopted in the construction industry for many years. The numerous iterations of activities (tasks) can result in a hierarchical structure that reflects the life cycle of this type of delivery system. The Design Structure Matrix (DSM) approach has been used for simplifying complex project activities by clarifying the relationships between activities through grouping. However, if there are a large number of coupled activities it can increase the design/build cycle time and it is difficult to apply grouping decomposition. This paper presents the Grouping Decomposition (GD) model that decomposes a large number of activities through grouping. It is used together with the K-means clustering algorithm which quantifies the relative coupling strength of the design/build activities. An example is proposed that demonstrates the GD modelling method. The results are compared with different grouping methods. These show that the proposed GD model performs well in partitioning and extremely well in clustering the coupled activities.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Technology Management (IJTM):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com